Substation 4 · Northern ring
Grid operations
Planned work tonight on the northern ring
Two feeders come out between 23:00 and 04:00 for pole replacement on the Fell Side spur. Expect the ring load to shift east while the work lasts.
Right now
NominalFeeders
Type to filter; click a header to sort.
Table
| Feeder | District | Load (MW) | Last switched | State |
|---|---|---|---|---|
| F-04 Harbour | East | 31.4 | Closed | |
| F-07 Mill Lane | North | 18.9 | Closed | |
| F-12 Quarry Road | West | 44.2 | Watch | |
| F-18 Beacon Hill | North | 7.6 | Open for work | |
| F-21 Saltings | East | 26.0 | Closed | |
| F-29 Fell Side | West | 52.8 | Fault logged | |
| F-33 Airfield | South | 12.1 | Closed | |
| F-41 Old Dock | South | 38.5 | Watch |
Job queue
Reclose test, F-12
Queued 08:40 · operator AM
Thermal survey, T-2
Queued 09:15 · operator CW
Reload sample data at the top of the page swaps these two cards for loading skeletons for about a second and puts them back: that is the skeleton component, with nothing fetched.
Shift notes
-
Handover from the night shift
Two feeders left open for planned work.
-
Reclose test queued on F-12
Requested by the district team.
-
Thermal survey under way on T-2
Oil temperature watched every ten minutes.
-
Maintenance window opens
Pole replacement on the Fell Side spur, four hours.
Alerts and notes
Watch: oil temperature rising on T-2
78 °C against a 90 °C limit, up 4 degrees in an hour.
Fault logged on F-29 Fell Side
Earth fault at 04:12, cleared by the protection.
Severity levels
Watch is a reading drifting towards a limit; fault is a protection operation already cleared.